Recently returned from an offshore trip to a gas processing platform in the Gulf of Thailand. The platform has a RO type watermaker built in 2000, and running with mostly original equipment. I was commissioned to prepare recommendations to upgrade the equipment to extend the service life without replacing the entire package.
|
|